Item Coversheet

10.

CITY OF STUART, FLORIDA
AGENDA ITEM REQUEST
CITY COMMISSION

Meeting Date:  5/11/2020 

Prepared by:  Tom Reetz

Title of Item:

STUART SPRINGTREE RPUD - FLUM AND RE-ZONING (QUASI-JUDICIAL)(RC):

 

ORDINANCE No. 2427-2020; AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF STUART, FLORIDA, AMENDING THE FUTURE LAND USE MAP OF THE CITY’S COMPREHENSIVE PLAN THEREBY ASSIGNING A FUTURE LAND USE DESIGNATION OF “MULTI-FAMILY RESIDENTIAL” FOR THREE PARCELS EQUALING 13.59 ACRES ANNEXED BY ORDINANCE NO. 2352-2017, OWNED BY STUART 13 ACRES, LLC, TIERRA DEL LAGO, INC. AND STUART HARBOR MARINA AND YACHT CLUB, LOCATED WEST OF S.E. FEDERAL HIGHWAY, SOUTH OF S.E. HARRISON STREET, AND NORTH OF THE NATALIE ESTATES MOBILE HOME PARK WITH SAID LANDS BEING MORE FULLY DESCRIBED IN EXHIBIT “A” ATTACHED; AND FURTHER PROVIDING THAT SAID LANDS SHALL CONCURRENTLY ESTABLISH THE STUART–SPRINGTREE RESIDENTIAL PLANNED UNIT DEVELOPMENT RPUD CONSISTING OF TWO HUNDRED EIGHTY (280) MULTI-FAMILY UNITS WITHIN SEVEN (7) INDIVIDUAL FOUR-STORY APARTMENT BUILDINGS; APPROVING A DEVELOPMENT SITE PLAN; PROVIDING FOR DEVELOPMENT CONDITIONS AND A TIMETABLE FOR DEVELOPMENT; DECLARING THE PLAN TO BE CONSISTENT WITH THE CITY’S COMPREHENSIVE PLAN; PROVIDING DIRECTIONS TO THE CITY CLERK; PROVIDING FOR REPEAL OF ALL ORDINANCES IN CONFLICT; PROVIDING FOR SEVERABILITY; PROVIDING FOR AN EFFECTIVE DATE, AND FOR OTHER PURPOSES.

 


Summary Explanation/Background Information on Agenda Request:

Ordinance 2427-2020 returns to the Commission for completion of First Reading.  On March 9, 2020 the applicant asked that the item be continued to tonight's meeting to allow more time to work on traffic concerns and buffers for the project.  Since then, the applicant has submitted a revised site plan with revisions including the most northern building having been reduced from four stories to three stories resulting in a reduction from 280 to 270 units, a lake with irregular shape and littoral plantings and the elimination of the Harrison Street access/connection and replaced with the addition of a U.S. Highway 1 connection which will allow residents to access the unused U-turn on U.S.1. As a result of eliminating the entry roadway connection to Harrison Street, 16 slash pines that would have been removed are now preserved. It should also be noted that the applicant is providing 344.5 more inches of trees in the preserve than required for mitigation. See Traffic access change Letter attached.

 

On February 24, 2020, the City Commission heard evidence from the applicant and intervenor.  After closing the hearing at the conclusion of the presentations and during deliberation, the Commission unanimously approved Commissioner Matheson's Motion to Table which was treated as a Motion to Continue the matter to March 9, 2020. Commissioner Matheson asked the applicant to consider reducing the number of units by 10; redesign the lake to an irregular shape; work with the surrounding neighborhoods regarding the sidewalks, lighting and height of the buildings as well as meet with the County for traffic calming ideas. Discussion also included looking at options for reducing building stories to 3 from 4 for one or more of the proposed buildings on the north and west of the site.

 

 

The vacant subject property is approximately 13.59 acres and consists of three parcels, located west of SE Federal Highway in an urban area on the south eastern edge of jurisdictional limits of the City of Stuart.  The applicant is proposing to construct 280 multi-family garden-style residential units consisting of seven 4 story garden-style apartment buildings all with elevators. For additional details and code reviews see attached staff report.

 

The property is comprised of both uplands and wetlands. The wetland has been qualified as a very low quality system which the South Florida Water Management Department requires no mitigation. The northern portion of the property contains pine flatwood forest which will be mostly retained as preserve.  A lake at the development's center will have littoral planting at it's perimeter then transitioning onto it's bank with native trees.    During First Reading, the applicant responded to each of the eleven conditions raised by the LPA including the addition of improved lighting, signage, landscape, a 6 foot wide sidewalk along Springtree Place and enhanced entry.

 

The proposed project consist of seven (7) four-story apartment buildings. In addition to the apartment buildings, there will be amenities such as a clubhouse, pool, dog park and car wash. The apartment access will be privately gated with two access points, one of from S.E. Springtree an existing open private road and from S.E. Harrison Street a Martin County maintained road to the north. The residents will also have opportunity to rent a garage for an automobile if desired. The property is bounded to the south by the Natilie Mobile Home Park which is in unincorporated Martin County. To the north is Coral Gardens single family and an Exon gas station with convenience store, also in Martin County.  To the east is vacant land with a CPUD zoning and is within the City of Stuart.   The main access to the property will be from Springtree, which has capacity for the additional trips related to the proposed development.

 

 



Funding Source:

N/A

 



Recommended Action:

Move approval of Ordinance No. 2427-2020 at first reading.

 

ATTACHMENTS:
DescriptionUpload DateType
Ordinance 2427-20205/1/2020Ordinance add to Y drive
Ordinance 2427-2020 Exhibit D5/1/2020Ordinance add to Y drive
Ordinance 2427-2020 D15/1/2020Ordinance add to Y drive
Ordinance 2427-2020 Exhibit D22/15/2020Ordinance add to Y drive
Traffic Access Change Letter 15/1/2020Backup Material
Traffic Access Change Letter3/13/2020Backup Material
Revised Traffic Report 2.272/28/2020Backup Material
Response to traffic comments 2.272/28/2020Backup Material
Comprehensive Plan Review2/17/2020Staff Report
Response letter to LPA conditions2/15/2020Backup Material
Springtree Project narrative2/15/2020Backup Material
Parking Statement 2.122/15/2020Backup Material
Applicant response letter1/22/2020Backup Material
Stormwater Report- updated1/22/2020Backup Material
FWC correspondence1/21/2020Backup Material
Intervenor Application2/15/2020Backup Material
LPA Meeting Minutes2/15/2020Backup Material
Staff Code Review2/28/2020Backup Material
Staff Comp Plan review3/13/2020Backup Material
Staff Report5/4/2020Backup Material
Staff Report5/4/2020Backup Material