CITY OF STUART, FLORIDA
AGENDA ITEM REQUEST
CITY COMMISSION

Meeting Date:  2/24/2020 

Prepared by:  Tom Reetz

Title of Item:

STUART SPRINGTREE RPUD - FLUM AND RE-ZONING (QUASI-JUDICIAL)(RC):

 

ORDINANCE No. 2427-2020; AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF STUART, FLORIDA, AMENDING THE FUTURE LAND USE MAP OF THE CITY’S COMPREHENSIVE PLAN THEREBY ASSIGNING A FUTURE LAND USE DESIGNATION OF “MULTI-FAMILY RESIDENTIAL” FOR THREE PARCELS EQUALING 13.59 ACRES ANNEXED BY ORDINANCE NO. 2352-2017, OWNED BY STUART 13 ACRES, LLC, TIERRA DEL LAGO, INC. AND STUART HARBOR MARINA AND YACHT CLUB, LOCATED WEST OF S.E. FEDERAL HIGHWAY, SOUTH OF S.E. HARRISON STREET, AND NORTH OF THE NATALIE ESTATES MOBILE HOME PARK WITH SAID LANDS BEING MORE FULLY DESCRIBED IN EXHIBIT “A” ATTACHED; AND FURTHER PROVIDING THAT SAID LANDS SHALL CONCURRENTLY ESTABLISH THE STUART–SPRINGTREE RESIDENTIAL PLANNED UNIT DEVELOPMENT RPUD CONSISTING OF TWO HUNDRED EIGHTY (280) MULTI-FAMILY UNITS WITHIN SEVEN (7) INDIVIDUAL FOUR-STORY APARTMENT BUILDINGS; APPROVING A DEVELOPMENT SITE PLAN; PROVIDING FOR DEVELOPMENT CONDITIONS AND A TIMETABLE FOR DEVELOPMENT; DECLARING THE PLAN TO BE CONSISTENT WITH THE CITY’S COMPREHENSIVE PLAN; PROVIDING DIRECTIONS TO THE CITY CLERK; PROVIDING FOR REPEAL OF ALL ORDINANCES IN CONFLICT; PROVIDING FOR SEVERABILITY; PROVIDING FOR AN EFFECTIVE DATE, AND FOR OTHER PURPOSES.

 


Summary Explanation/Background Information on Agenda Request:

The vacant subject property is approximately 13.59 acres and consists of three parcels, located west of SE Federal Highway in an urban area on the south eastern edge of jurisdictional limits of the City of Stuart. The City Commission unanimously approved the annexing of the three parcels into the City of Stuart on May 8, 2017. The applicant is proposing to construct 280 multi-family garden-style residential units consisting of seven 4 story garden-style apartment buildings all with elevators. For additional details and code reviews see attached staff report.

 

On January 30, 2020, the Local Planning Agency unanimously approved the project with the following conditions:

 

  1. Address bus stops to make them safer

  2. Extend ornamental fence on the west side of the road

  3. Increase parking calculation to 484, but garages can be included in the calculation

  4. Include exterior trash cans, grills, signage, exterior lighting in site plan

  5. Implement a car wash station  

  6. Solution to mail delivery and mailboxes

  7. Work to get permission to add sidewalk connection through “preserve” area

  8. Indicate the correct unit count and submit the floor plans

  9. Address charging stations

  10. Include rules or deed restrictions regarding dogs

  11. Submit a detailed construction activity plan

 

Since then, the applicant has responded to each of the eleven conditions including the addition of improved lighting, signage, landscape, a 6 foot wide sidewalk along Springtree Place and enhanced entry and has had conversations with the Department of Transportation agreeing to a temporary access off U.S.1 thus avoiding using Springtree Place during the construction phase.

 

Additionally, a revised Traffic Study has been forwarded to the City's traffic consultant for review along with Parking statement.  Floor plans depicting studio, one, two, and three bedroom layouts are now attached as exhibits to the Ordinance.

 

The intent of this application is to assign a Residential Planned Unit Development (RPUD)  zoning designation and a multifamily land use to property recently annexed into the city in order to construct 280 multifamily units on 13.59 acres owned by Stuart 13 Acres, LLC, Tierra Del Lago and Stuart Harbor Marina and Yacht Club.

 

The proposed project consist of seven (7) four-story apartment buildings. In addition to the apartment buildings, there will be amenities such as a clubhouse, pool, dog park and car wash. The apartment access will be privately gated with two access points, one of from S.E. Springtree an existing open private road and from S.E. Harrison Street a Martin County maintained road to the north. The residents will also have opportunity to rent a garage for an automobile if desired.

 

The property is bounded to the south by the Natilie Mobile Home Park which is in unincorporated Martin County. To the north is Coral Gardens single family and an Exon gas station with convenience store, also in Martin County.  To the east is vacant land with a CPUD zoning and is within the City of Stuart.   The main access to the property will be from Springtree, which has capacity for the additional trips related to the proposed development.

 

The property is comprised of both uplands and wetlands. The wetland has been qualified as a very low quality system which the South Florida Water Management Department requires no mitigation. The northern portion of the property contains pine flatwood forest which will be mostly retained as preserve.  A lake at the development's center will have littoral planting at it's perimeter then transitioning onto it's bank with native trees.   

 

The Springtree Home Owner's Association has applied as Intervenor for tonight's meeting. See Intervener application attached

 



Funding Source:

N/A

 



Recommended Action:

Recommend approval of  Ordinance No. 2427-2020 assigning a Residential Planned Unit Development zoning and assigning a future land use map change of multi-family to the City Commission for First Reading.

 

ATTACHMENTS:
DescriptionUpload DateType
Ordinance 2427-20202/15/2020Ordinance add to Y drive
Ordinance No. 2427-2020 Exhibit D2/15/2020Ordinance add to Y drive
Ordinance 2427-2020 D12/15/2020Ordinance add to Y drive
Ordinance 2427-2020 D22/15/2020Ordinance add to Y drive
Staff Report2/17/2020Staff Report
Comprehensive Plan Review2/17/2020Staff Report
Response letter to LPA conditions2/15/2020Backup Material
Springtree Project narrative2/15/2020Backup Material
Revised Traffic Study 2.122/15/2020Backup Material
Parking Statement 2.122/15/2020Backup Material
Consultant comments (2nd Round)1/21/2020Backup Material
Applicant response letter1/22/2020Backup Material
Stormwater Report- updated1/22/2020Backup Material
FWC correspondence1/21/2020Backup Material
Intervenor Application2/15/2020Backup Material
LPA Meeting Minutes2/15/2020Backup Material